Frequently Asked Questions - CivicPlus.CMS.FAQ
Shaker Heights OH Homepage
Search

Frequently Asked Questions

Below you will find information that might help you understand how to find things or learn about information you might need to know about your city or town.

Architectural Board of Review (ABR)

4
  • All exterior changes or additions to a building or structure on a property require ABR approval.

    Architectural Board of Review (ABR)
  • The board meets on the first and third Monday of the month. Meetings are held in the morning and begin at 8:00 a.m. Visit Architectural Board of Review for the current meeting schedule and information about appearing before the Board.

    Architectural Board of Review (ABR)
  • A complete submission, including several specific details and plans, must be submitted by the deadline for the meeting at which you would like to appear. Visit Architectural Board of Review for the current meeting schedule and information about appearing before the Board. 

    Architectural Board of Review (ABR)
  • Sheds less than 200 square feet

    A shed of less than 200 square feet does not require a Building Permit, but still must comply with design review and zoning regulations and review is required.

    For a shed of less than 200 square feet, please provide:

    • Site plan showing the distance to the property lines from the sides of the structure.
    • Photos of the area where the shed will be placed along with the house for context.
    • Drawings/plans/specs/brochure that show construction including exterior materials, including color, and final structure height.
    • $15 design review fee.

    Sheds more than 200 square feet

    For a storage structure of more than 200 square feet see above and the following is required:

    • Architectural Board of Review Application and fees
    • Completed Building Permit application and fees
    • Foundation plan.

    Additional requirements for all sheds

    • A shed is permitted in the rear yard only (storage structure per zoning ordinance).
    • A shed requires a 3 to 5 foot setback from the rear and side property lines depending on your zoning district and a 10 foot setback from the house.
    •  A shed is limited to 10 feet in height.

    Submit your shed application

    Submit your application through our online application portal and Planning Department staff will review on behalf of the Architectural Board of Review and for zoning compliance. There is a $15 review fee that will be assessed once the shed is approved. Questions? Contact Dan Feinstein in the Planning Dept.

    Architectural Board of Review (ABR)

Building - Plan Review

2
  • Most building projects require a plan review. Per state codes, both residential and commercial projects require a plan review to ensure that the proposed work conforms to the building codes. Plans are reviewed by the building code plans examiner; depending on the scope of the project, plans may also be reviewed by the Planning Department, Fire Department, Public Works Department, and the City Engineer. Once an approval is granted and the fees have been paid, the permits will be issued, authorizing construction to begin. Please note:

    • Plans and re-submissions are reviewed in the order in which they’re received.
    • Per state code, each plan review submission will take 30 days or less. The scope and scale of the project influence the time required for review. 
    • Residential alterations are typically reviewed within three to five business days.
    • New homes, substantial additions, site changes, and all commercial plans typically take between 10 and 20 business days.

    Learn More about Plan Reviews

    The plan review process depends on the type of project. Projects that affect only the interior of an existing structure require review only by the Department of Building & Housing. Projects that affect the exterior of the structure — including new construction and projects affecting both the interior and exterior (i.e. additions) — require an additional review by the Architectural Board of Review (ABR). Specifically:

    Exterior & New Construction Projects

    Any modifications or additions to the exterior of a building (residential or commercial) and all new construction projects require review and approval by the Architectural Board of Review (ABR) before being reviewed for code compliance by the Department of Building & Housing.

    The ABR’s review ensures changes to the exterior appearance of buildings in Shaker Heights maintain the high standard of architectural quality in the community. The Planning Department manages this process for the ABR. 

    Please also note:

    • Certain exterior changes, such as commonly installed types of fences, can be approved by staff in the Planning Department. Please call the Planning Department at 216-491-1430 to inquire about your project.
    • Not all projects going before the ABR are approved at the first meeting, and you may need to appear before the board a second or third time. You’ll want to be sure to take the timing of the ABR meeting dates into consideration when planning your project.

    Get started with the Architectural Board of Review process.

    Interior

    Alterations to the interior only of a building (residential or commercial) require a plan review by only the Department of Building & Housing. Certain projects, such as concrete work, repaving, roofs, fences, hot water heaters, HVAC, and other simple projects can be submitted without plans and are typically approved on the spot, provided proper documentation is included. If you are unsure if your project requires plans, please call us at 216-491-1461.

    You must submit a Building Permit Application to initiate the plan review process with the Department of Building & Housing.

    In order to ensure a thorough and timely review of your Building Permit Application, please make sure your plans meet the minimum requirements. Three sets of drawings are required. All commercial plans must be stamped by a state registered design professional. View minimum residential plan requirements.

    Building - Plan Review
  • Residential

    Scaled drawings are required for most residential projects, except roofs, windows, and mechanical equipment. Installation/replacement of HVAC equipment requires load calculations (instructions are on the permit application). An architect is not required for residential projects, but is recommended for large projects and additions. Include cut sheets for any new equipment or devices. Written narratives of the proposed work is often necessary to fully explain the scope of the work.  View a complete list of residential plan requirements.

    Commercial

    Yes.  Plans for commercial projects must be prepared and stamped by a state licensed design professional.


    Building - Plan Review
  1. OH Shaker Heights home page

Contact Us

  1. City of Shaker Heights
    3400 Lee Road
    Shaker Heights, OH 44120
    Phone: 216-491-1400
    Fax: 216-491-1465

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow